GANGTOK, 20 April: Sludge from the Army compound just above National Highway 31A near Sikkim Jewels in Tadong last evening disturbed traffic flow along the stretch last night and early this morning. A joint effort by Tadong Outpost personnel, Traffic Police personnel and GREF workers managed to clear some of the sludge on the road to allow vehicular movement at around 8 AM. Traffic, however, remained affected throughout the day.
Showing posts with label Sludge. Show all posts
Showing posts with label Sludge. Show all posts
Sunday, April 22, 2012
SLUDGED OUT
GANGTOK, 20 April: Sludge from the Army compound just above National Highway 31A near Sikkim Jewels in Tadong last evening disturbed traffic flow along the stretch last night and early this morning. A joint effort by Tadong Outpost personnel, Traffic Police personnel and GREF workers managed to clear some of the sludge on the road to allow vehicular movement at around 8 AM. Traffic, however, remained affected throughout the day.
Monday, February 28, 2011
Rangit Stage-IV project developer drains untreated sludge into river
![]() |
| Untreated sludge from Adit-III of Rangit Stage IV slimes into the Rangit at Rohtak |
![]() |
| Rangit Stage IV project site |
DISTRICT AUTHORITIES SHOWCAUSE COASTAL PROJECT Pvt Ltd, FOLLOW-UP INSPECTION SCHEDULED FOR TUESDAY
ANAND OBEROI
GANGTOK, 28 Feb: Coastal Project Pvt. Ltd, contracted by hydel developer Jal Power Development Corporation and engaged at the Adit-II tunnels of Rangit Stage- IV hydroelectric project at Rothak, West Sikkim, 7 kilometers from Jorethang towards Legship has been show-caused by the Department of Forests and the West district administration for “illegally dumping untreated waste” from the tunnels into the Rangit river.
Subscribe to:
Posts (Atom)


